L4E rule 5 (2018)
Jump to navigation
Jump to search
This article covers L4E rule 5 for the 2018 L4E workload system. An overview of the L4E rules is found in the L4E rules of 2018.
The definitive reference for the rule is found on the CAP-ACP website.[1]
Overview
- This rule applies to specimens that require a synoptic report as per the College of American Pathologists (CAP) or are required by provincial health authorities.
Details
Specimen type(s) | Weight (L4E) | Details | Examples |
---|---|---|---|
all non-radical resections with cancer for which a synoptic report has to be filled-out as per CAP guidelines | 3 L4E per synoptic report, at least 5 L4E for a given case | if the case is <5 L4E = 5 L4E for whole case; if the case is >5 L4E, 3 L4E/synoptic filled out | malignant colorectal polyp in 2 blocks = 5 L4E, breast lumpectomy with carcinoma in 16 blocks = 4 L4E (rule 4) + 3 L4E (for synoptic report), hemithyroidectomy with PTC in 20 blocks = 5 L4E (rule 4) + 3 L4E (for synoptic report) |
Note:
- Radical resections are covered by L4E rule 9.
Further examples
Specimen | Rule 5 applies? | L4E | Explanation |
---|---|---|---|
Invasive malignant melanoma - 1 punch biopsy | Yes | 5 L4E | synoptic has to be done, would otherwise by 1 L4E as per rule 1 |
Melanoma in situ - 1 punch biopsy | No | 1 L4E | no synoptic has to be done, rule 1 applies |
Partial nephrectomy in 10 blocks with clear cell RCC | Yes | 2.5 L4E + 3 L4E (synoptic) | synoptic has to be done, rule 4 and rule 5 apply |
Lumpectomy in 24 blocks with DCIS | Yes | 6 L4E + 3 L4E (synoptic) | synoptic has to be done, rule 4 and rule 5 apply |
Cytoprostatectomy in 32 blocks with prostate cancer and bladder cancer | Yes | 8 L4E + 3 L4E (synoptic for prostate cancer) + 3 L4E (synoptic for bladder cancer) | synoptic has to be done, rule 4 and rule 5 apply |
See also
References
- ↑ Workload and Workforce Committee of the CAP-ACP. Workload Measurement Guidelines. Canadian Association of Pathologists (CAP-ACP). 2018. URL: https://www.cap-acp.org/cmsUploads/CAP/File/CAP-ACP_Workload_Model_2018_Final_2020180907(1).pdf. Accessed on: 19 May 2019.